Environmental Protection Agency (EPA) Model Lead Based Paint Risk Assessor Practice Test

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the EPA Model Lead Based Paint Risk Assessor Test. Utilize flashcards and multiple-choice questions, each with hints and explanations. Ensure you are ready for your exam!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


Which work condition can lead to higher levels of lead dust?

  1. Working alone

  2. When the condition of paint is deteriorated or a known lead hazard exists

  3. After a fresh coat of paint

  4. During routine cleaning

The correct answer is: When the condition of paint is deteriorated or a known lead hazard exists

The correct answer highlights the risk associated with deteriorated paint or known lead hazards. When the condition of paint is deteriorating, such as peeling, chipping, or cracking, it can release lead dust into the environment. This is particularly critical in homes built before 1978, a time when lead-based paints were commonly used. Even small amounts of deterioration can create a significant lead dust hazard, which can be harmful upon inhalation or ingestion, especially for young children and pregnant women. In addition, if there are known lead hazards, the disturbance of these areas, whether through renovation or simply through daily wear and tear, can lead to an increase in lead dust accumulation in the air and on surfaces. Addressing these lead hazards promptly and properly is essential to minimize the risk of lead exposure. Other conditions, such as working alone, applying a fresh coat of paint, or routine cleaning, don’t inherently increase lead dust levels in the same way. In fact, fresh paint can often encapsulate the lead underneath, thereby reducing immediate risks, and routine cleaning, if done safely, can help manage lead dust rather than exacerbate the problem.