Environmental Protection Agency (EPA) Model Lead Based Paint Risk Assessor Practice Test

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the EPA Model Lead Based Paint Risk Assessor Test. Utilize flashcards and multiple-choice questions, each with hints and explanations. Ensure you are ready for your exam!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


How far should samples be taken from the building exterior during soil sampling?

  1. 1 to 2 feet

  2. 2 to 3 feet

  3. 3 to 4 feet

  4. 5 to 6 feet

The correct answer is: 2 to 3 feet

The correct response indicates that soil samples should be collected from 2 to 3 feet away from the building exterior. This distance is recommended because it helps to minimize contamination from paint chips, dust, and lead that may have settled in close proximity to the structure. Sampling at this distance ensures that the samples collected provide a more representative analysis of the lead levels in the soil, reflecting general exposure risk rather than localized contamination near the building. Collecting samples closer than 2 feet could yield higher lead concentrations due to direct deposition from the building or from nearby surfaces, whereas sampling beyond 3 feet might introduce variables from other environmental factors or areas less influenced by the lead source from the building. Thus, measuring within the 2 to 3 feet range is a standardized practice that balances the need for accurate representation of lead exposure risks while accounting for potential contaminants closely tied to the structure.